Tuesday, December 7, 2021

Latest project may extend West 25th’s density

This is a basic massing of The Pearl to show its potential scale, if it wins
support from the Duck Island Block Club. Architectural details will be
added after this conceptual phase is refined. Overlooking Walworth
Run ravine, The Pearl would offer market-rate apartments above
retail at the intersection of West 25th Street and Columbus
Road. This view looks generally north (Bialosky).
CLICK IMAGES TO ENLARGE THEM

A frantic pace of development continues in and near Cleveland’s Duck Island enclave, where Tremont meets Ohio City, especially along West 25th Street south of the Market District. The latest entry is Independence-based Realife Real Estate Group’s The Pearl, a seven-story apartment building over parking and a retail space.

READ MORE

Monday, December 6, 2021

Cleveland Flats peninsula finally coming back to life

One of the largest vacant tracts of land near Cleveland’s urban core
moved closer to development this week with City Planning Com-
mission’s approval of schematic plans for Silverhills at Thunder-
bird. The project is located on the mostly undeveloped Scranton
Peninsula across the Cuyahoga River from downtown Cleveland.
That huge peninsula, once home to steel production facilities and
lumberyards, sat mostly vacant for 40 years and is finally coming
 back to life (Dimit). CLICK IMAGES TO ENLARGE THEM

Friday was a big day for Scranton Peninsula in Cleveland’s Flats. A new brewpub opened in a repurposed industrial structure next to the Cuyahoga River. City Planning Commission gave conditional approval to plans for a new neighborhood that would add more than 300 housing units to the city’s riverfront. And the commission approved new zoning for a large area of the Flats to support additional development.

READ MORE

Friday, December 3, 2021

Hough tower to be redeveloped, expanded in $34M project

Vacant for at least a decade, stripped of salvageable items by thieves,
open to the elements and now vines are climbing up the side of the
condemned 10-story apartment building at 9410 Hough Ave. as
seen in this July 2021 view. But that’s not deterring SLSCO Ltd.
from taking on the project and even expanding it to include
a large new community center (Google).
CLICK IMAGES TO ENLARGE THEM.

A major project to redevelop a vacant and blighted 10-story building, as well as to construct a large community center on Hough Avenue on Cleveland’s East Side was revealed by a city official at today’s City Planning Commission meeting. The development is one of many planned or underway in the Hough neighborhood which had long been a poster-child for urban decay in Cleveland.

READ MORE

Downtown project delayed by commissioners’ absence

An aerial view looking northward toward the proposed Apartments
at Bolivar to be located just north of the Erie Street Cemetery and on
the southeast side of downtown’s central business district (Desmone).
CLICK IMAGES TO ENLARGE THEM

City Planning Commission today was unable to advance a major downtown Cleveland project toward design approval, despite its members enthusiastically supporting an earlier conceptual version of the plan. In recent months, multiple commission meetings had to be ended early before important agenda items could be addressed, resulting in those projects being delayed to a future meeting where the applicants had to sit through another hours-long session.

READ MORE

Thursday, December 2, 2021

City Club Apartments groundbreaking set

A formal groundbreaking ceremony for the 23-story, roughly 250-
foot-tall City Club Apartments in downtown Cleveland is planned
for 11 a.m. Dec. 10. However, there are signs that site preparations
in the 700-block of Euclid Avenue are about to begin (Vocon).
CLICK IMAGES TO ENLARGE THEM

Among the new Sherwin-Williams (SHW) headquarters, Fairmount Properties’ Fairfax Market/Apartments and the City Club Apartments, where was the betting line on the City Club tower officially breaking ground first? If you bet the last to be the first, you’re a winner.

READ MORE

Tuesday, November 30, 2021

Funds sought for Cleveland-Chicago rail development plan

Amtrak’s existing (blue) and proposed (green) routes and stations are
shown here, with a focus on the Cleveland-Chicago transportation cor-
ridor. A group of metropolitan planning organizations in the corridor
led by Greater Cleveland’s Northeast Ohio Areawide Coordinating
Agency want to address freight and passenger rail traffic congestion
on the busy Norfolk Southern rail line to allow for expansion of both
 (Amtrak Connects US). CLICK IMAGES TO ENLARGE THEM

Agencies between Cleveland and Chicago have joined forces to request federal funds to identify how best to expand freight and passenger rail services on the busy Norfolk Southern (NS) Corp.-owned rail line that links those metro areas.

READ MORE

Monday, November 29, 2021

Sherwin-Williams HQ construction starts (PHOTOS)

The roof of the Rockefeller Building, above the 17th floor of John
D. Rockefeller’s classic structure at 614 W. Superior Ave., offers
a front-row seat to the construction of another addition to the
downtown Cleveland skyline — the global headquarters of
Sherwin-Williams (all photos are contributed or by KJP).
CLICK IMAGES TO ENLARGE THEM

Nov. 29, 2021 may be remembered as the day that construction work began on Sherwin-Williams’ $300-plus-million global headquarters. To others, it may be known as the date when one of downtown Cleveland’s largest “parking craters” died. Even though the official groundbreaking ceremony isn’t scheduled until 5 p.m. Dec. 15 (hopefully with no further delays), it looks like quite a bit of work may be under way by that time.

READ MORE